Install peel and stick roofing in a similar manner.
How to install roll shingle roofing.
How to do it attach first course.
It not only protects the roof but it also protects the fascia.
Position the first course so it overhangs the drip edges by about 1 4 inch and roll it out a.
Plan so that no two butt joints are closer than 2 feet from each other.
Continue to chalk additional guidelines based on the width of the shingle through at least four courses rows across the roof.
Nail it in place with roofing nails that penetrate at least 3 4 inch into.
Installing the rolled roofing 1.
The strips should always be horizontal.
Drip edge or drip cap is either plastic or sheet metal.
Prepare a valley between joined roofs by cutting a strip that is 18 inches wide and covers the entire length of the valley.
For extra durability you may install roll roofing in two layers.
Spread the roofing cement along the.
Using a measuring tape measure 35 inches 89 cm up from.
To seal a plumbing vent spread roofing.
Cut the rolled roofing.
Apply roofing cement to the roof.
Every 5 inches make a new mark until you get to the rop of the roof.
To install roll roofing you ll need to cut the material into long strips of the correct length for your roof and lay it flat.
Mark a chalk line to identify the end of your first layer.
It also helps if you first install a layer of roofing felt.
Repeat this on both sides of the roof.