If everything appears in order wait one half hour for the adhesive to bond and then make any last minute adjustments needed source.
How to fit rubber roofing.
Rubber shingles can be used in addition to a flat rubber roof to improve the appearance.
Carefully fold the membrane back over the section and roll flat.
The seams must all be taped and sealed and then the rubber shingles can be nailed down on top in rows.
Old house web.
Starting from one side of the roof roll out the materials of the rubber roof.
Classicbond rubber roofing epdm whether you are a roofing professional or home owner and looking for a flat rubber roofing material that is both sustainable.
Step 3 apply adhesive.
Also allow for the slope of the roof and edge overhangs.
Allow for a 150mm overhang of material on each edge so add 300mm to the overall dimension.
If you have a flat roof and want a more attractive option it is possible to apply rubber shingles on top of the rolled rubber roof.
Apply the adhesive to both the epdm rubber roof material and the roof itself with a roller.
After 30 minutes fold the lower half of the rubber strip on top of the upper section and clean it with a broom over the exposed rubber and roof.
Carefullyfold half the rubber membrane on top of itself taking caution not to create any wrinkles.
Roll out the rubber membrane.
If you have read any other guides on how to fit a rubber roof you will have read that they advise you to allow the membrane time to relax for 20 minutes or so.
Side note i mentioned that the epdm is supplied as a single sheet.
The rolls are cut to fit then unrolled across the roof and smoothed out to avoid air bubbles.
If you re planning on installing an epdm roof in colder months we recommend storing the rubber membrane in room temperatureto help speedthe process.
2 begin to open stir and prepare the water based deck adhesive.
Either liquid adhesives or special roofing tape is used to seal the seams of the roofing system.
There are four key stages involved in installing an epdm rubber roof which when followed will ensure a smooth a fault free finish on top of your decking.
Epdm step by step.
After the time has expired fold the lower half of the rubber strip on top of the upper section and run a broom over the exposed rubber and roof.
How to install rubber roofing.
Roll out the rubber across the adhesive trim where necessary and check for air bubbles.
The slope dimension is greater than the building dimension measured on plan.