Remember to stack the blocks so that the vertical joints stager.
How to build a dry stack concrete block wall.
Cut straight down with the shovel keep from disturbing the surrounding soil.
Then stack bricks or stones at least 1 5 feet 0 46 m above the ground level.
Begin stacking each course of block for the wall space required.
Allow the bedding material to set.
Throughout the block stacking phase and at the completion check that the wall has remained level.
Tamp down the bottom of the trench using a soil tamper.
This video shows you how to build a dry stack concrete block wall without mortar using quikrete quikwall surface.
If your wall goes across a slope you can dig a series of stepped trenches so that only one course of blocks is below ground.
Begin by clearing the building zone and digging a trench around the planned structure s perimeter.
Make the trench as level as you can to save time later.
Be sure the mortar bed and first course of blocks are level.
How to build a block wall without mortar.