Begin by drilling holes in the concrete with a hammer drill.
How to install studs to concrete wall.
Drill at least 1 4 inch deeper into the concrete than the fastener s embedment and suck dust out of the hole with a shop vac.
Drive three concrete nails spaced at even intervals through each side of each hat channel.
When you buy the screws you ll also need to get a special bit that makes a pilot hole matched to the fastener.
Identify where the ceiling joists above run and in which direction.
You can typically get the best equipment for this at local construction rental stores.
So there is enough gap for air to flow.
Working with steel studs requires a few special tools.
Insert the sleeve fasteners into the holes and make sure they are secure and positioned correctly.
Check basement walls for moisture.
Masonry screws are an easy solution to concrete fastening chores.
Tighten all the nuts to ensure the stud is secure.
Clear the holes of all debris using compressed air a shop vac or wire brush.
If the plastic is.
Start by checking the basement walls for excessive moisture.
You should typically allow for 1 stud per every 12 inches 300 mm of linear wall space.
How to frame an inside wall against a concrete wall.
Purchase steel plates also.
Carefully position the furring strips or 2x4s in the exact desired position.
Most jurisdictions require a 4 mil plastic sheet vapor barrier for basement walls against concrete.
Metal cut off saw fasteners a hammer drill screw gun chalk box level laser level or plumb bob 1 x research source clampsstep 2 determine the number of steel studs needed.
Wedge anchors are fasteners that rely on expanding sleeves to anchor two by fours permanently.
That is if the studs are going to touch the concrete wall.
Use wedge anchors to fasten studs to concrete.
Step 1 rent or purchase the right tools.
Cut four or five two by four blocks each perhaps 10 to 12 inches long and insert them between the end studs on.
Use concrete nails and a concrete nail gun to attach the hat channels to the wall after drawing a plumb line to make sure you ve spaced the hat channels properly for the size of drywall and insulation you re using.
If the ceiling is unfinished with the joists uncovered the task is easy.
Once you ve drilled the holes you ll need only a hammer and a wrench to install the wedge anchors.
Or you can leave a 4 inch gap between the studs and concrete wall and probably get away with it.
Use duct tape to secure a 2 foot square piece of polyethylene sheeting to the wall.