Nail the roofing in place with short roofing nails spaced 6 inches apart and 1 inch in from the outer edges of the roll roofing.
How to install roll roofing with nails.
The key to a tight roof is applying the roofing when it is warm enough for.
How to apply roll roofing installation using the concealed nail method.
For hips and.
Attach the upper edge with the large head roofing nails.
The valley of the roof is the point on the roof where the two sides meet.
The nails should start.
Add a second piece of full width roll roofing over the first.
Use a trowel to spread roofing cement over half or more of the strips.
Nail down the 18 inch roll roofing sheet that it is covering the valley.
If you have a sloped roof cut strips of roofing 9 inches wide position them flush with the drip edges along the eave and rake and attach them by driving two rows of nails that are about 3 inches apart.
Install the roofing nails 1 from the upper edge of the rolled roofing.
It is best to install this roof during warm weather.
How to nail down roll roofing step 1.
Apply about two inches worth of cement under either side to seal the roofing down and then nail it down making sure it still stays flat and even as you go.
Before you go about installing your rolled roofing you have to make sure that the temperature is feasible enough.
Roll roofing comes in diverse colors that can complement both the existing roofing and the entire structure.
Things you ll need rolled roofing razor knife trowel brush hose measuring tape ladder roofing cement 1 inch 2 5 cm long roofing nails hammer chalk.
Using the exposed nail method.
Cover the valley of the roof.
Install each course of roofing like the concealed nail method.
Make sure that the roof is completely clean.
Step 7cement the first course edges.
Once the first row is done add approximately two inches of cement to the top of the first row to secure the second row of roofing.
As you work your way up.