Use a trowel to scoop up the roofing cement.
How to install roll roofing shingles.
It not only protects the roof but it also protects the fascia.
Spread the roofing cement along the.
Prepare a valley between joined roofs by cutting a strip that is 18 inches wide and covers the entire length of the valley.
Cut the rolled roofing.
Position the first course so it overhangs the drip edges by about 1 4 inch and roll it out a.
It also helps if you first install a layer of roofing felt.
For extra durability you may install roll roofing in two layers.
Use the chalk line to snap a straight line vertically every 6 inches.
Do not use the eaves as a guide instead because they can be uneven.
Using a measuring tape measure 35 inches 89 cm up from.
Install roll roofing when the temperature is at least 50 degrees fahrenheit to keep the material from cracking.
Use your chalk and tape measure to mark about 12 inches up on the roof for the first set of shingles.
Every 5 inches make a new mark until you get to the rop of the roof.
To install roll roofing you ll need to cut the material into long strips of the correct length for your roof and lay it flat.
Installing the rolled roofing 1.
How to do it attach first course.
The strips should always be horizontal.
To seal a plumbing vent spread roofing.
Snap a chalk line as a guide for the first layer roofing.
Install peel and stick roofing in a similar manner.
Nail it in place with roofing nails that penetrate at least 3 4 inch into.
Plan so that no two butt joints are closer than 2 feet from each other.
Install roll roofing measure 35 inches up from the eaves at several intervals along the roof and mark them.
Repeat this on both sides of the roof.