Attach it to the valley with roofing nails spaced 6 inches apart about 3 4 inch from the edge.
How to install roll roofing on a shed.
Step 6nail the first course match the overhang to the overhang of the starter strip 1 4 to 3 8 from the drip edge.
You can install roll roofing on your own but it goes more smoothly with a helper so grab a friend and get started.
Place a sheet of 36 inch roll roofing directly over the 18 inch roofing that is covering the valley.
Cut the rolled roofing.
Mark a chalk line to identify the end of your first layer.
Install a drip edge around the perimeter of the roof.
3 take a roll of 18 inch wide roofing and use it to cover the length of the valley.
10 easy steps for diy rolled roofing installation 1 spend some time cleaning the roof before beginning a rolled roofing installation project.
Apply roofing cement to the roof.
Cut the sections of flashing with tin snips as needed and nail.
Attach drip edge along the edge of the roof with roofing cement.
Make sure the rolled roofing is parallel to the eve of the roof.
This aluminum flashing protects the edges of the roof sheathing from water.
Again trim any roofing that extends beyond the edge of the roof.
Make sure the roofing material is laying flat with no bumps or wrinkles attach the upper edge with the large head.
Position the first course so it overhangs the drip edges by about 1 4 inch and roll it out a.
How to do it attach first course.
To seal a plumbing vent spread roofing.
Plan so that no two butt joints are closer than 2 feet from each other.
Using a measuring tape measure 35 inches 89 cm up from.
2 like any other roof project you should start this one by addressing the valleys.
Spread the roofing cement along the.