Space the fasteners by about 12 inches.
How to install drip edge on rake of roof.
Use 1 inch galvanized roofing nails or 3 4 inch exterior screws.
Be sure to tuck the drip edge under the starter strip and felt paper.
Apply a continuous bead of cement along the top of the drip edge then press down on the shingle.
At the rake the drip edge is installed over the underlay.
Installing drip edge on your roof.
Place a nail at one end then the other.
The above figure shows the correct application of the drip edge.
How to install drip edge flashing to a new roof.
When you install the drip edge over this strip it keeps the lower flange further from the home s siding which helps to keep water further from the home.
Overlap two pieces of flashing that meet end to end by at least 1 inch.
A furring edge is a strip of one by two wood you install on the vertical surface of the house just beneath the roof s edge.
Install drip edges on the eaves first.
Slide the corner tight to the fascia.
No cutting is needed for this piece.
Tools supplies tin sn.
Place the drip edge down aligning it so water will drip into the gutters.
Remember 98 of adhesion failures are caused by contamination so follow these simple steps carefully.
Slightly open the hemmed edge to slide this piece over top of the installed piece on the eave.
Make sure the corner is tight and that the bottom edge is tight to the fascia before nailing off the drip edge.
Secure the drip edge with roofing cement.
To install a drip edge on a newly constructed roof or on a re roofing job attach the drip edge along the roof s eaves first.
At the eaves the drip edge should be installed before the eave protection membrane.
In today s video we go over the basic techniques to installing drip edge and rake edge on your roof.
Install the drip edge by fitting it on the roof eave pushing it tightly against the edge of the plywood and nailing or screwing it down.
Find out the steps for installing drip edge or dripguard including trim lok s drip rail by watching the video above.
Align the leading bottom edge of the first piece on the gable rake with the front edge of the drip edge installed on the eave.
This is important to protect damage to your fascia soffits rafters.
With without rain gutters.
On the gable rake install drip edge starting at the bottom and working up.
While the vertical leg should be placed 1 4 1 2 away from the fascia.
You can refer to the steps on this page as you go.
The drip edge should be nailed centered in the top surface every 8 to 10 inches.
Make sure the outer edge extends over the gutter.