Clear the holes of all.
How to fur a concrete wall.
Step 2 place the first furring strip over a vertical line.
Pre drill the holes in the furring strips so they do not crack when.
Whether poured or block built properly a concrete wall is strong and will not rot warp or invite termites and other.
Mark the wall for vertical furring strips installed 16 inch on center.
Determine the desired position of the furring strips or 2x4s before drilling any holes.
With a pencil or a.
Make exact measurements ensure.
Mark the cinder block wall every 16 inches vertically and then every 16 inches horizontally to form a grid pattern.
Now repeat this process at the top of the wall.
How to frame poured walls.
Using the level plumb down the wall and draw a line for reference.
Tapcon concrete screw installation.
Determine spacing and location of furring strips.
These markings will indicate where you will vertically attach your.
With a pencil or a marker draw vertically lines from.
Equip yourself with a tape measure and spread it cross the bottom of the wall your about to furr out.