Use 1 inch nails for new roofing.
How to do rolled roofing.
To lay the rolled material on the parapets cut a piece of the desired length then mechanically attach it to the top edge of the parapet then glued to the base fabric fusing.
To seal a plumbing vent spread roofing.
How to do it attach first course.
For laying the material in the corners internal and external it must be cut as a larger sheet and then to be stuck overlapped.
Using a measuring tape measure 35 inches 89 cm up from.
Enlist the help of one or two helpers to handle the long strips.
Apply roofing cement to the roof.
This reduces the chances of wrinkles after the roofing is installed.
Cut the rolled roofing.
Spread the roofing cement along the.
Roll roofing is not very pliant or flexible in cold weather of fewer than 45 degrees fahrenheit and it can crack and break if.
They are long enough to penetrate the sheathing.
Use a trowel to scoop up the roofing cement.
Use 1 nails for re roofing.
Prepare a valley between joined roofs by cutting a strip that is 18 inches wide and covers the entire length of the valley.
Position the first course so it overhangs the drip edges by about 1 4 inch and roll it out a.
Nail it in place with roofing nails that penetrate at least 3 4 inch into.
Valleys will be open so flash them before hand with metal or two layers of roll roofing the first an 18 inch wide strip and the second 36 inches wide.
Installing the rolled roofing 1.
Mark a chalk line to identify the end of your first layer.