Run a chalk snap line between the marks and snap the line against the slab to lay out the position of one of the wall s sides.
How to build a stud wall on concrete australia.
Drill at least 1 4 inch deeper into the concrete than the fastener s embedment and suck dust out of the hole with a shop vac.
First off it is essential to make sure the cuts are square.
Turn each plate on its side so the widest face runs vertically.
Repeat at the other end of the board.
Start with the 4 components.
Stretch a tape measure across the concrete slab and mark the position of the wall s ends.
Install the stud wall bottom plate.
Now nail the timber into place.
Cut one stud for every stud mark made.
Use a hammer drill with 3 16 masonry bit to drill a hole through the wood and into the concrete floor.
If the wall continues the line of an existing wall use a straight edge to mark that line across the floor.
Measure the gap the wall will cover along the floor and cut a piece of timber to length.
Masonry screws are an easy solution to concrete fastening chores.
Cut pressure treated 2 x 4 boards to length and lay them along the chalk line.
Walls are built from the ground up.
When you buy the screws you ll also need to get a special bit that makes a pilot hole matched to the fastener.
Nail through the bottom wall plate into the concrete beneath with a powder actuated nail gun or other masonry fastener.
Mark the top and bottom plate for the stud positions by laying the plates together and marking at the same time.
Use an impact driver to drive a 3 tapcon screw through the wood and into the floor.
2 0 75 d track to be used in walls over 2 7m high or if the wall calls for 0 75 stud and or the internal pressure is greater then 0 25 kpa.
Nail through the first plate into the end of a stud aligned according to the guide marks with.
There are 4 main components to a stud wall.
3 1 15 d track use 1 15 d track for top bottom tracks when a 1 15 stud wall exceeds 3 0m high and where the wall design calls for 1 15 stud system.