Make sure you use a strong hammer and 1 inch 2 5 cm roofing nails.
How to apply roll roofing adhesive.
Install drip edge flashings roofing felt and wsu if needed.
How to install peel stick roll roofing on a flat roof.
Open a can of roofing cement.
How to do it.
Place the second row of roofing so the top edge.
Installation tips and guides.
Apply a 2 inch wide layer of roofing cement across the top of the first row of roofing.
Dip a 2 inch wide brush into the cement and lay a 2 inch line of cement from end to end of the roof.
Roll the paper across the roof horizontally and work a way to the top of the roof.
Hammer raised nail heads into the roof deck to ensure a smooth surface for an effective.
Then seal the hip or ridge using 12 x 36 strips of roll roofing bent lengthwise so that 6 lies on either side of the hip or ridge.
Use adhesive under entire roll and between overlaps to bond together layers of paper when applying roofing paper start at the lowest point on the roof.
Overlap paper no less than 4 inches and up to 24 inches depending on system instructions.
Ensure that you hammer the nails properly into the roof don t leave the nails sticking up above the layer.
This video demonstrates proper application techniques for tarco fiberglass mineral surfaced roll roofing.
You can install metal valley flashing but it is common to.
Modern technologies have significantly improve the performance of bitumen roll materials to extend their service life of up to 15 25 years and made them more universal.
This is an asphalt based glue that will adhere to almost anything.
Sweep the roof deck with a push broom in order to remove debris such as stones leaves twigs moss and loose dirt.
Roll roofing at hips and ridges bring the roofing courses on either side of a hip or ridge up so that the roofing edges meet along the hip or ridge.
Cut the second piece of roll roofing the length of the roof.
Hammer nails into the rolled roofing to secure it.