Install the drip edge on the gable ends of the roof after you finish installing your underlayment.
How to apply cold process roofing.
Repairing a roof leak on a built up tar and gravel roof can be a lot of work but it is a lot more work if you don t know how.
Start at the bottom side of the gable and overlap the sections of drip edge a few inches as you work your way up the roof see figure a.
Apply the roofing membrane in the opposite manner so that you never have to step on the tar.
Thd sku 290188.
Work from the farthest part of the roof back towards the ladder.
Once the gravel is removed wh.
Use 1 5 gallons of adhesive per 100 square feet of roof.
Use a tin snips to cut the drip edge to size.
This aluminum flashing protects the edges of the roof sheathing from water.
If cold adhesive is not appropriate for a particular application modified bitumen membranes may also be applied by torch heat welding self adhesive or hot asphalt.
Install a drip edge around the perimeter of the roof.
The systems can be completed as new or remedial construction or can be applied over existing smooth surfaced roof systems in an effort to extend the service.
Waterproofs and chemically bonds layers of rolled roofing.
Roofer s choice 5 gallon cold process roof adhesive for use on new and re roofing applications.
Apply a coating of cold tar adhesive to the entire roof.
One of the primary advantages of cold process roof systems is their relative ease of application.
Nail it every couple of feet.
Cut the sections of flashing with tin snips as needed and nail.