Make sure the outer edge extends over the gutter.
How is drip edge installed on a roof.
The roof leg should extend a minimum of 2 back onto the roof sheathing.
4 deep nail the drip edge to the sheathing every 16.
If it doesn t pull the drip edge out slightly from under the shingles.
While the vertical leg should be placed 1 4 1 2 away from the fascia.
It is also sometimes called d metal for drip.
Using drip edge with a nailing edge approx.
How to install a drip edge.
A t shaped drip edge flashing is better because it adds distance between the edge of the roof and the fascia.
Secure the drip edge with roofing cement.
Apply a continuous bead of cement along the top of the drip edge then press down on the shingle.
How to install drip edge flashing to a new roof.
Slip the wide flat flange of the material all the way under the first course of roof shingles as illustrated.